• <span id="1vuki"></span>
      <thead id="1vuki"><optgroup id="1vuki"></optgroup></thead>
      <rt id="1vuki"><optgroup id="1vuki"><strike id="1vuki"></strike></optgroup></rt>
      • <bdo id="1vuki"><meter id="1vuki"></meter></bdo>
        <center id="1vuki"></center>
        TOP
        ?Key points for quality control in mold manufacturing
        Time:2023/6/1

        1) Effectively manage product data, process data, and drawing documents: effectively manage product data, process data, and drawing documents to ensure the comprehensiveness of files and the consistency of drawing versions; Enable effective sharing and query utilization of drawings. A complete file management computer database can be established to organize and utilize the design drawings, scattered information, and previously scattered and isolated information accumulated by the design department, in order to prevent problems caused by design drawings, 2D and 3D confusion, original, design changes, and maintenance versions confusion, inconsistency between 3D models and 2D drawing data, and non-standard and chaotic 2D drawing designs that are difficult to detect and correct in a timely manner, Causing modifications, rework, or even invalidation of the mold, increasing the manufacturing cost of the mold, prolonging the mold manufacturing production cycle, and affecting the delivery time

        2) Maintain the consistency and completeness of mold drawings, processing techniques, and physical data: By effective, meticulous, and rigorous testing methods, ensure the consistency and completeness of mold drawings, processing techniques, and physical data

        3) The design and manufacturing costs of each set of mold must be summarized in time: effectively manage the scrapping of tools by effectively controlling the issuance of work vouchers in the workshop; Through accurate mold structure design, efficient mold component processing, and accurate component inspection, the additional costs caused by mold design changes and maintenance will be effectively reduced, thereby obtaining the actual cost of each set of molds and effectively controlling mold quality

        4) Overall planning: Organizes and integrates information such as planning, design, processing technology, workshop production status, and human resources to effectively coordinate planning and production, ensuring mold quality and delivering on schedule

        5) Develop a complete and practical mold production management system: Develop a complete mold production management system to achieve a computer information management system for product data management, process data management, plan management, and schedule management in the mold production management process, including mold production plan formulation, mold design, process formulation, workshop task allocation and product inspection, warehouse management, etc, Enable comprehensive tracking and management of mold manufacturing and related auxiliary information from planning to completion and delivery

        6) Establish a failure mode and impact analysis library: Establish a failure mode and impact analysis library for mold design and manufacturing, and prevent the occurrence of the same problem in the next time through meetings, announcements, computer sharing, bonus and penalty measures. It can also serve as a reference for future quality evaluation and design

        7) Establish processing process preparation: Establish processing process preparation, summarize mold parts list, purchased parts list, standard parts list, self-made parts list, self-made standard parts list, material list, heat treatment parts list, vulnerable parts list, and mold cost, to ensure that relevant resources are available in a timely manner. By combining production plan management and progress management, we ensure that relevant equipment can be effectively used, prevent personnel from being idle, and ensure that all processes in processing and manufacturing are interconnected

        8) Establish a quality inspection department, strictly regulate testing methods, eliminate the mentality of "similar" luck, and ensure the accuracy of mold processing of various parts. Effectively control the quality of molds, and effectively relate quality to individuals based on previous and subsequent process records. It can enhance the design and operator's sense of responsibility

        9) Based on the situation of our company and customers, develop mold design standards and mold design operation instructions that are suitable for our company and customers; Mold manufacturing standards, mold manufacturing operation instructions, standardized mold design and mold manufacturing; To prevent the old mold making thinking from creating molds that do not meet customer requirements due to personal habits

        10) Standardize procurement, warehouse and production orders, material entry and exit, tool loss reporting, shipment management, streamline material supply chain, and prevent production disconnection

        11) Establish an assessment system, regularly train and assess relevant mold design and manufacturing personnel, and discover and cultivate the company's backbone elite team

        12) Standardize the functions of each position, ensure that people fulfill their duties and talents, and prevent overstaffing

        13) Establish a follow-up management team for mold projects: establish a communication and supervision bridge between departments such as customer market engineering procurement manufacturing warehouse injection molding, conduct detailed communication and technical aspects, fully understand customer mold technical requirements, record and summarize communication content, and accurately convey it to each department, avoiding repeated, repeated, trial, modification, and rework, thereby saving costs and time. Gradually establish a knowledge base of customer business and technical information for each customer, and share it within the company to improve customer service level and reduce errors. Follow up and supervise the production progress of the mold project, arrange trial molds, follow up on relevant materials, confirm sample testing, send samples, arrange mold delivery, and other matters

        主站蜘蛛池模板: 丁香六月激情综合| 日韩亚洲综合精品国产| 色综合婷婷在线观看66| 亚洲国产精品成人综合色在线| 国产精品天干天干综合网| 亚洲国产综合专区电影在线| 色综合天天综合狠狠| 国产成人综合久久精品亚洲| 伊人久久大香线蕉综合电影网| 亚洲综合在线另类色区奇米| 亚洲欧洲自拍拍偷综合| 狠狠色综合TV久久久久久| 国产亚洲综合成人91精品| 色欲久久久久久综合网精品| 一本一本久久aa综合精品| 熟天天做天天爱天天爽综合网| 激情97综合亚洲色婷婷五| 本道久久综合无码中文字幕| 亚洲欧洲日韩综合| 国内偷自视频区视频综合| 图片区精品综合自拍| 久久99国产综合精品| 狠狠人妻久久久久久综合蜜桃 | 制服丝袜人妻综合第一页| 亚洲国产成人五月综合网| 狠狠色伊人亚洲综合网站色| 伊人狠狠色丁香综合尤物| 伊人色综合久久大香| 国产亚洲综合久久系列| 少妇人妻综合久久中文字幕| 色综合久久中文字幕综合网| 亚洲综合色婷婷在线观看| 麻豆狠色伊人亚洲综合网站| 伊伊人成亚洲综合人网7777| 国产婷婷色综合AV蜜臀AV| 久久99精品久久久久久综合| 九月婷婷综合婷婷| 伊人久久大香线焦AV综合影院| 狠狠色综合色综合网络| 激情综合色综合久久综合| 久久综合一区二区无码|